1st Base (Cu-Zn-Pb VMS)
Project Summary
Commodities
Copper, Zinc, Lead
Deposit Type
VMS
Location
Finlayson Lake District, Yukon - Click for Map
Size
28 Claims, 558ha
Exploration Stage
Drill
Ownership
100% Arcturus with 3% NSR
Technical Report
- The property is underlain by similar geology to the Kudz Ze Kayah deposit and has geochemical anomalies with peaks of 1430 ppm Cu, 5700 ppm Zn and 2040 ppm Pb in addition to several coincident geophysical anomalies
- Geochemistry and Geophysics outlined four moderate strength anomalies labeled A-D. Drilling planned on all four identified targets
- Anomaly A is a 300 x 400 meter area of >250 ppm copper. Anomalous lead and zinc values at Anomaly A are over a smaller area but reach peak values of 930 ppm lead and 1250 ppm zinc. This anomaly corelates with a moderately conductive EM response obtained over a 400 meter length
- Anomaly B is a broad copper anomaly centered northwest of Anomaly A. Copper values reach a peak of 950 ppm while lead and zinc values are strongly anomalous (peaks of 2040ppm and 5700ppm respectively)







